| |
|
|
Damen Shipyard
Optimarin has supplied the OBS with 250m³/h capacity (skid solution) to NB project at Damen Galati Romania.
:: Read more
|
| |
|
| |
|
|
GulfMark Offshore
Following the recently announced GulfMark Offshore vessel construction program, Optimarin is happy to inform that the type approved Optimarin Ballast System will be installed on board the seven new builds that Gulf has contracted in Norway, Poland and Italy.
:: Read more
|
| |
|
| |
|
|
CSS Derwent - Compact Semi Submersible
According to the IMO Ballast Water Management Convention, Mobile Offshore Units (MOUs) also require to have a ballast water treatment system installed when the convention enters in to force. With the recently received order for a skid mounted 250 m³/h Optimarin Ballast System for the Compact Semi Submersible “CSS Derwent”, it is confirmed that the Optimarin system is also suitable for this very complex type of vessels.
:: Read more
|
| |
|
| |
|
|
Mitsubishi Heavy Industries
Optimarin is happy to announce that Mitsubishi Heavy Industries (MHI) have ordered Optimarin Ballast Systems. The systems will be installed on board the two Ramform W-class seismic vessels that MHI is building at their Nagasaki Shipyard for Norwegian ship owner Petroleum Geo-Services ASA (PGS).
:: Read more
|
| |
|
| |
|
|
Daewoo Shipbuilding & Marine Engineering (DSME)
Optimarin has signed an agreement with Daewoo Shipbuilding & Marine Engineering (DSME) in Korea, where Optimarin will deliver Optimarin Ballast Systems to the five 55.000 dwt Open Hatch Gantry Craned (OHGC) vessels that DSME are constructing for Saga Shipholding (Norway), a 100% subsidiary of Nippon Yusen Kaisha (NYK) Japan.
:: Read more
|
| |
|
| |
|
|
Oshima Shipbuilding
Optimarin has signed an agreement with Oshima Shipbuilding in Japan, where Optimarin will deliver Optimarin Ballast Systems to the three 55.000 dwt Open Hatch Gantry Craned (OHGC) vessels that Oshima Shipbuilding are constructing for Saga Shipholding (Norway), a 100% subsidiary of Nippon Yusen Kaisha (NYK) Japan.
:: Read more
|
| |
|
| |
|
|
Torvald Klaveness Group
Optimarin has entered into an agreement with the Torvald Klaveness Group, where Optimarin will deliver Optimarin Ballast Systems to the four 2500 TEU container vessels currently under construction at Yangzijiang Shipbuilding in China.
:: Read more
|
| |
|
| |
|
|
Evergreen Marine Corporation
Optimarin has signed an agreement with Evergreen Marine Corporation, one of the worlds largest shipping firms, where Optimarin will deliver Optimarin Ballast Systems to the twenty 8000 TEU container vessels currently under construction at Samsung Heavy Industries in Korea.
:: Read more
|
| |
|
| |
|
|
Optimarin lands major bulk carrier contract
Optimarin has cemented its good relationship with Grieg Shipping Group with a contract to install its ballast water treatment systems onboard 10 open-hatch conventional crane general cargo carriers currently under construction at Hyundai Mipo Dockyard in Korea.
:: Read more
|
| |
|
| |
|
|
Optimarin grips firmly on offshore market with major contracts.
Optimarin has signed a number of high profile contracts to install its ballast water treatment systems onboard offshore vessels owned and operated by some of the major players in the offshore industry.
:: Read more
|
| |
|
| |
|
|
Bridging the Gulf
Optimarin has entered into a frame agreement with Gulf Offshore Norge, the Norwegian subsidiary of GulfMark Offshore. This agreement covers the delivery of ballast water treatment systems for GulfMark vessels – no mean feat by any account.
:: Read more
|
| |
|
| |
|
|
The Royal Netherlands Navy
Optimarin will deliver two Type Approved Optimarin Ballast Systems to the Royal Netherlands Navy. The systems will be installed on board the naval supply ship Hr. Ms. Amsterdam.
:: Read more
|
| |
|
| |
|
|
“K” Line Offshore AS
Optimarin AS will deliver the Type Approved Optimarin Ballast Systems for the Anchor Handling Tug Supply Vessels that “K” Line Offshore AS is building at STX Norway Offshore AS Langsten.
:: Read more
|
| |
|
| |
|
|
Siem Offshore
Kleven Maritime has ordered two Optimarin Ballast Systems for BN335 and BN336 which they are building for Siem Offshore.
:: Read more
|
| |
|
| |
|
|
“K” Line Offshore AS
Optimarin AS will deliver the Type Approved Optimarin Ballast Systems for the four Platform Supply Vessels that “K” Line Offshore AS is building at STX Norway Offshore AS Brevik.
:: Read more
|
| |
|
| |
|
|
Gulf Offshore
In September 2009 Optimarin installed a 334 m3/h system onboard Gulf Offshores MV North Mariner
:: Read more
|
| |
|
| |
|
|
Neptune Offshore
The Optimarin Ballast System will be installed on two newbuilds for Neptune Offshore.
:: Read more
|
| |
|
| |
|
|
Klaveness
Installation aboard Klavenes cement carrier KCL Banshee, used in Type Approval testing of the Optimarin Ballast System.
:: Read more
|
| |
|
| |
|
|
Princess Cruises
The first Optimarin Ballast System was installed onboard the Regal Princess.
:: Read more
|
| |
|